丰满老妇bbwbbwbbw-超碰c-jizz少妇-日韩欧美专区-亚洲国产精品久久久久-国产精品xx-韩日一区二区三区-真性中出-亚洲日本在线播放-伊人色影院-久久123-69综合-老妇裸体性猛交视频-久一久久-国产一线在线观看-丝袜脚交国产在线观看-久久久香蕉网-永久久久久久久-亚洲狠狠婷婷综合久久久久图片-91欧美一区-成人做爰全过程免费观看-伊人久久电影院-男人女人拔萝卜视频-我的好妈妈在线观看-超污视频软件

立即搜索

The bird's Nest Stadium

The National Stadium (Bird's Nest) is located in the southern part of the Beijing Olympic Park, the main stadium for the 2008 Beijing Olympic games. The total project covers an area of 21 hectares, the audience seating for 91000. They held the opening and closing ceremonies, the track and field competitions, and the football finals of the Olympic Games, paralympics. After the Olympic Games, it became a large professional place for the citizens of Beijing to participate in sports activities and enjoy sports and entertainment, and became a landmark sports architecture and Olympic heritage.
Started construction in December 24, 2003, completed in March 2008, the total cost of 2 billion 267 million yuan. As a national landmark, the main stadium of the 2008 Olympic Games, the national stadium structure features are very significant. The stadium is a super sports building and a large stadium. The design time of the main structure is 100 years, the fire resistance rating is level 1, the seismic fortification intensity is 8 degrees, and the waterproof grade of underground works is 1.
微信掃描關(guān)注我們
工作時(shí)間: 周一至周五
9:00-18:00

Contact:Miss Cheng

Mobile:86-13512345678

Telephone:86-010-12345678

Email:12345@qq.com

Address:Room 906, 8th Building Garden, XueYuan Road HaiDian District Beijing China

your company Copyright ICP 123456789